CBMC

 

Supplemental Environmental Impact Statement Inner Harbor Navigational Canal Lock Replacement Project (draft), Orleans Parish

The following files are in Adobe PDF format. Some of the files are very big - please note the file size before trying to open or download them on a slow connection. If you cannot open them, you may need to install Adobe Acrobat Reader - click here to download the program.


Supplemental Environmental Impact Statement Inner Harbor Navigational Canal Lock Replacement Project (draft), Orleans Parish (85MB)

Appendix A: Correspondence (214kb)

Appendix B: USFWS and NOAA Fisheries Coordination (400kb)

Appendix C: Water Quality and Sediment Evaluation (7.5MB)

Appendix D: Cast-in-Place vs. Float-in-Place (10MB)

Appendix E: Confined Disposal Facility Conceptual Design Report (14.5MB)

Appendix F: Disposal Alternative Report (2MB)

Appendix G: Lock Navigability Study (3MB)

Appendix H: 2008 Needs Assessment Report (2MB)

Appendix I: Coastal Zone Management Consistency Determination (1.5MB)

Appendix J: Traffic Analysis (4MB)

Appendix K: Noise Analysis (16MB)

Appendix L: Air Quality Analysis (55kb)

Appendix M: Wetland Value Assessment (150kb)

Appendix N: Fish and Wildlife Coordination Act Report (3MB)

Appendix O: IHNC Lock Replacement Study, 2008 Updated Economic Analysis (185kb)

Appendix P: Scoping Meeting Report (46kb)

Appendix Q: 404(b)(1) Analysis (684kb)

Appendix R: Confined Disposal Facility Human Health Evaluation (56kb)

 

< Return
  line  
 
Website by
GCR